Test Programs That Don't Waste Time, Budget, or Credibility
We help aerospace and advanced mobility teams design test programs that generate the right data, satisfy certification requirements, and keep programs on track—without guessing what 'good enough' looks like.
Your Test Program Is Critical. Why Does It Feel Like You're Building the Plane While Flying It?
❌ "The Requirements Are Moving Targets"
You're designing test procedures while the design team is still finalizing requirements. Every change ripples through your test plan, and you're constantly playing catch-up.
❌ "Nobody Agrees on What 'Comprehensive' Means"
Engineering wants detailed characterization. Program management wants fast results. Certification wants proof of compliance. Your test matrix is trying to satisfy everyone and satisfying no one.
❌ "The Instrumentation Plan Is a Moving Target"
You're three weeks from test and still arguing about sensor placement, data acquisition rates, and which parameters actually matter for verification.
❌ "Test Execution Feels Like Controlled Chaos"
Test day arrives. Your procedures are 80% complete. Your setup isn't verified. Your data acquisition triggers aren't validated. And everyone's watching.
We Build Test Programs That Work the First Time
Structured Test Strategy
Not a generic template. A tailored test approach that maps your verification requirements to specific test types, sequences, and acceptance criteria—before you commit resources.
Instrumentation Plans That Make Sense
We define sensor types, locations, accuracy requirements, and data acquisition strategies based on what you're actually trying to prove—not vendor spec sheets.
Test Procedures That Technicians Can Follow
Clear, unambiguous procedures with setup instructions, safety checks, data collection steps, and acceptance criteria. No interpretation required.
Test Readiness Review Support
We prepare your Test Readiness Review (TRR) package, walk your team through readiness criteria, and ensure all stakeholders agree you're ready to execute—before you commit to test.
Test Execution Support
We don't disappear after planning. We're there during setup validation, dry runs, and test execution to troubleshoot issues and ensure data quality in real time.
The Process: From Requirements to Data Package
Requirements & Risk Assessment
(Week 1)
We review your verification requirements, design documentation, and test constraints. We identify high-risk areas, critical parameters, and gaps that will cause problems later.
Test Strategy & Instrumentation Planning
(Weeks 2-3)
We develop your test matrix, define test sequences, select instrumentation approaches, and create data acquisition requirements. You see exactly what will be tested and how.
Procedure Development & TRR Preparation
(Weeks 3-6)
We write detailed test procedures with setup diagrams, safety checks, step-by-step instructions, and data acceptance criteria. We prepare your Test Readiness Review package to ensure all stakeholders align before execution.
Execution Support
(Test Campaign)
We support setup validation, participate in dry runs, troubleshoot instrumentation issues, and verify data quality during test execution. You're not alone when things go sideways.
What You Receive
What This Service Covers
✅ What's Included
- Understanding your test requirements and existing test articles
- Developing test plans, procedures, and instrumentation strategies
- Test Readiness Review preparation and support
- On-site or remote execution support (from days to full campaigns)
- Data quality verification and troubleshooting
❌ Not Included in This Service
- Design of test apparatus, fixtures, or structural test rigs
- Custom data acquisition software development
- Long-term facility operations or maintenance
This Service Is For You If...
We've Been in Your Seat
We've Actually Run These Programs
We're not consultants who read standards and write reports. We've designed test facilities, specified instrumentation, written procedures, and stood in test cells when things didn't go as planned. Recent work includes propulsion system verification testing with motor and inverter assemblies along with customized propellers.
We Know Your Standards
Part 25 aircraft programs, eVTOL regulatory pathways, propulsion system qualification. We know what certification authorities expect and how to structure test programs that satisfy their requirements.
We Speak Test Engineer
Strain gauges vs. accelerometers. DAQ sampling rates. Signal conditioning. Test matrix design. We know the language because we've done the job.
What It Takes
Typical Timeline
6-8 weeks from kickoff to test-ready procedures
Execution Support
Coordinated with your test campaign schedule—from a few days to full campaign duration
Investment
Determined during free consultation based on test complexity, number of test articles, and execution support requirements.
Let's Talk About Your Test Program
Free 30-minute consultation. We'll review your requirements, discuss your test challenges, and outline an approach that makes sense for your program.
Schedule Free Consultation